What We Do
Site civil and dry utility engineering, from first feasibility sketch to final inspection.
Civil Engineering
Due diligence through as-built. 17 services covering the full civil scope of a development project.
View services ↓Dry Utility
Will-serve letters through field conflict resolution. 14 services managing PG&E, gas, telecom, and CATV.
View services ↓Civil Engineering
Early / Pre-Design
- Due Diligence Reports & Constraints MapsSite constraints mapped before design starts.
- Entitlement Coordination & DesignTentative maps, CUPs, planning submittals.
- Site Planning & Efficiency OptimizationLayout tested for yield, code, and cost.
- Subdivision, Condo & Townhome MappingTentative and final maps, recorder-ready.
Design
- Site Civil & GradingGrading, earthwork, retaining walls, cut/fill.
- Stormwater ManagementC.3, LID, PDP, BES — every framework.
- Hydrology & Hydraulic ModelingDrainage calcs and pipe sizing in-house.
- Hydromodification (HMP)Continuous simulation and HMP sizing.
- Water System Design & ModelingEPAnet modeling, fire flow, domestic pressure.
- Sanitary Sewer & Storm Drain DesignCollection systems and service connections.
- Site ADA & CBC Chapter 11B CompliancePath of travel, accessible parking, ramps.
- Fire Access & Fire Marshal CoordinationAccess roads, turnarounds, hydrant placement.
- Permitting Assistance & CoordinationPlan check responses and resubmittals.
Construction
- SWPPP & Erosion ControlRUSLE calcs, BMP selection, QSD sign-off.
- Peer Review & 3rd Party ReviewsFind issues before plan check does.
- Construction AdministrationRFIs and field revisions by engineer of record.
- As-Built DrawingsRecord drawings of what was built.
Dry Utility
Pre-Design
- Will Serve LettersCapacity confirmation from each provider.
- Service Extension ApplicationsPG&E, gas, telecom, CATV paperwork.
- Joint Trench IntentsReserves trench alignment and timeline.
Design
- Joint Trench DesignSingle coordinated trench, all providers.
- PG&E Green Book CoordinationGreenbook-compliant electrical design.
- Rule 16 Service Line ExtensionsOverhead-to-underground conversions.
- Rule 20 UndergroundingRule 20 A, B, and C undergrounding.
- Transformer & Switchgear SitingPad locations and clearance routing.
- Electrical Vault PlacementPrimary vaults, pull boxes, splice vaults.
- Gas, Telecom & CATV Conduit DesignConduit sizing, routing, and separation.
- Composite Utility PlansAll providers on one construction sheet.
Construction
- Temporary Power ApplicationsPG&E 79-980 for construction power.
- Pre-Construction CoordinationMulti-provider coordination before mobilization.
- Field Conflict ResolutionField changes documented and approved.
Tell us about your project
Share the scope and schedule. We'll return a fixed-fee proposal within five business days.